Registration · Done for you
Factory License Registration
OSH Code, 2020 Compliance
Needed for manufacturing units with 20 or more workers (with power) or 40 or more (without power) under the OSH Code, 2020, in force since 21 November 2025. We handle Plan Approval and the Licence from the Directorate of Factories & Boilers.
- 5-YearValidity Option
- Follow every step from your phone
- Written quote first
License Grant
Factory License Registration · sample
Every step tracked in your login
- Written quote before any work
- Secure online payment
- One office number
A breach of the OSH Code can cost a fine of ₹2 lakh to ₹3 lakh, plus up to ₹2,000 a day while it continues, and heavier penalties, including imprisonment, where a breach causes death.
What you get
Everything handed over, nothing left hanging.
License Grant
Kept in your login to download any time, with every paper of the work.
Every step in view
Your quote, payment, documents and each stage of the work on one screen.
Reminders before dates
The returns and renewals that follow are added to your dates, with a reminder before each.
A person to ask
Chat with the team doing the work. Calls go to the one office number.
At a glance
What this service covers
Two-Stage Approval
1. Plan Approval
Before construction/occupancy, the factory building plan and layout must be approved by the Chief Inspector of Factories.
2. License Grant
After plan approval, the application (Form 2) is filed to get the license for manufacturing operations (valid 1-5 years).
Worker Safety
The license ensures proper ventilation, sanitation, and safety fencing of machinery as per the Act's guidelines.
Options
Packages
We simplify the complex filing process for all factories.
Building Plan NOC
Before Construction/Expansion
Initial Stage
- Form 1 Submission
- Architect Plan Scrutiny
- Stability Certificate Filing
- Safety Report Drafting
License Grant
After Plan Approval
Form 2 Filing
- Form 2 Application
- NOC from Fire Dept
- Pollution Dept Consent (PCC)
- Inspection Management
Hazardous Unit
Chemical / Explosives
Special Case
- Everything in License Grant
- On-Site Emergency Plan
- Health & Safety Policy
- Explosive Dept NOC
Amounts are indicative. The fee for your case comes in a written quote, with our professional fee, government fees and GST shown separately. Nothing starts until you accept it.
Documents
Documents we will ask for
Nothing to send now. After you accept the quote and pay, you upload these from your phone against this same list, and each one shows whether it is received, approved or needs to be sent again.
Approved Factory Layout Plan
(Architect Signed)
Fire NOC
(No Objection Certificate)
Pollution Dept Consent
(Consent to Establish/Operate)
List of Machinery, Raw Materials & Finished Goods
ID Proof
of Occupier & Manager
The work, stage by stage
Stages of the work
You see these same stages in your login once the work starts, and you are told when each one is done.
- 1
Plan Submission
Submit building plans to the Chief Inspector for approval.
- 2
NOC Collection
Obtain mandatory NOCs from Fire, Water & Pollution Control Boards.
- 3
Form 2 Filing
Submission of the formal license application (Form 2) online.
- 4
License Grant
Post-inspection, the license is granted, legally allowing operations.
Questions
Frequently asked
Something else on your mind? Call the office - it is always the same number.
When is a Factory License mandatory?
Under the OSH Code, 2020 (in force from 21 November 2025), premises where 20 or more workers work with power, or 40 or more without power, on any day of the last 12 months are a factory and need a licence; hotels and restaurants are excluded. A factory with 10 or more workers must also register as an establishment within 60 days.
Who is the 'Occupier' under the Act?
The 'Occupier' is the person who has ultimate control over the affairs of the factory (usually the Managing Director, Partner, or Proprietor). They hold the legal responsibility for compliance.
How is the license fee calculated?
The license fee is calculated based on two main factors: The number of workers employed and The total installed Horsepower (HP) of the machinery. Fees vary significantly by state.
Related services
More in Registration
Startup India
Unlock the 3-Year Tax Holiday (with the Inter-Ministerial Board certificate) and easier Public Procurement.
View the serviceTrade License
Mandatory for every business with a physical address. Get your Municipal Trade License quickly to avoid shop sealing and heavy penalties.
View the serviceFSSAI Registration
Mandatory for all Food Business Operators (FBOs). Secure your 14-Digit FSSAI License Number to build trust and ensure legal compliance.
View the serviceFSSAI License
For food businesses with turnover above ₹1.5 crore: a state licence up to ₹50 crore and a central licence above it, from 1 April 2026.
View the serviceICEGATE Registration
Mandatory for all Importers & Exporters. Register your IEC & AD Code on ICEGATE to file Shipping Bills, Bills of Entry, and claim IGST refunds.
View the serviceImport Export Code
Unlock global markets with a 10-digit DGFT Code. Mandatory for all Import-Export businesses.
View the serviceNext step
Ready to start Factory License Registration?
Tell us what you need. A sales expert calls you from the office number and sends a written quote.
