Skip to content

PARISHRAMA CONSULTING SERVICES PRIVATE LIMITED

PARISHRAMA CONSULTING SERVICES PRIVATE LIMITED · Monday to Saturday, 10:00 am to 6:30 pm

Registration · Done for you

Factory License Registration

OSH Code, 2020 Compliance

Needed for manufacturing units with 20 or more workers (with power) or 40 or more (without power) under the OSH Code, 2020, in force since 21 November 2025. We handle Plan Approval and the Licence from the Directorate of Factories & Boilers.

  • 5-YearValidity Option
  • Follow every step from your phone
  • Written quote first
You receiveDone

License Grant

Factory License Registration · sample

Every step tracked in your login

  • Written quote before any work
  • Secure online payment
  • One office number

Our fee

In a written quote, before any work

Our fee, government fees and GST shown separately. Nothing is charged until you accept.

Get a written quote

About: Factory License Registration

+91

No charge for the call or the quote. We use these details only to answer your enquiry. See our privacy policy.

Secure online paymentGST invoiceOne office number

A breach of the OSH Code can cost a fine of ₹2 lakh to ₹3 lakh, plus up to ₹2,000 a day while it continues, and heavier penalties, including imprisonment, where a breach causes death.

What you get

Everything handed over, nothing left hanging.

  • License Grant

    Kept in your login to download any time, with every paper of the work.

  • Every step in view

    Your quote, payment, documents and each stage of the work on one screen.

  • Reminders before dates

    The returns and renewals that follow are added to your dates, with a reminder before each.

  • A person to ask

    Chat with the team doing the work. Calls go to the one office number.

At a glance

What this service covers

Two-Stage Approval

  • 1. Plan Approval

    Before construction/occupancy, the factory building plan and layout must be approved by the Chief Inspector of Factories.

  • 2. License Grant

    After plan approval, the application (Form 2) is filed to get the license for manufacturing operations (valid 1-5 years).

  • Worker Safety

    The license ensures proper ventilation, sanitation, and safety fencing of machinery as per the Act's guidelines.

Options

Packages

We simplify the complex filing process for all factories.

  • Building Plan NOC

    Before Construction/Expansion

    Initial Stage

    • Form 1 Submission
    • Architect Plan Scrutiny
    • Stability Certificate Filing
    • Safety Report Drafting
  • License Grant

    After Plan Approval

    Form 2 Filing

    • Form 2 Application
    • NOC from Fire Dept
    • Pollution Dept Consent (PCC)
    • Inspection Management
  • Hazardous Unit

    Chemical / Explosives

    Special Case

    • Everything in License Grant
    • On-Site Emergency Plan
    • Health & Safety Policy
    • Explosive Dept NOC

Amounts are indicative. The fee for your case comes in a written quote, with our professional fee, government fees and GST shown separately. Nothing starts until you accept it.

Documents

Documents we will ask for

Nothing to send now. After you accept the quote and pay, you upload these from your phone against this same list, and each one shows whether it is received, approved or needs to be sent again.

  • Approved Factory Layout Plan

    (Architect Signed)

  • Fire NOC

    (No Objection Certificate)

  • Pollution Dept Consent

    (Consent to Establish/Operate)

  • List of Machinery, Raw Materials & Finished Goods

  • ID Proof

    of Occupier & Manager

The work, stage by stage

Stages of the work

You see these same stages in your login once the work starts, and you are told when each one is done.

  1. 1

    Plan Submission

    Submit building plans to the Chief Inspector for approval.

  2. 2

    NOC Collection

    Obtain mandatory NOCs from Fire, Water & Pollution Control Boards.

  3. 3

    Form 2 Filing

    Submission of the formal license application (Form 2) online.

  4. 4

    License Grant

    Post-inspection, the license is granted, legally allowing operations.

Questions

Frequently asked

Something else on your mind? Call the office - it is always the same number.

When is a Factory License mandatory?

Under the OSH Code, 2020 (in force from 21 November 2025), premises where 20 or more workers work with power, or 40 or more without power, on any day of the last 12 months are a factory and need a licence; hotels and restaurants are excluded. A factory with 10 or more workers must also register as an establishment within 60 days.

Who is the 'Occupier' under the Act?

The 'Occupier' is the person who has ultimate control over the affairs of the factory (usually the Managing Director, Partner, or Proprietor). They hold the legal responsibility for compliance.

How is the license fee calculated?

The license fee is calculated based on two main factors: The number of workers employed and The total installed Horsepower (HP) of the machinery. Fees vary significantly by state.

Next step

Ready to start Factory License Registration?

Tell us what you need. A sales expert calls you from the office number and sends a written quote.