Skip to content

PARISHRAMA CONSULTING SERVICES PRIVATE LIMITED

PARISHRAMA CONSULTING SERVICES PRIVATE LIMITED · Monday to Saturday, 10:00 am to 6:30 pm

Registration · Done for you

Fire License Registration

Fire NOC

Mandatory No Objection Certificate (NOC) from the Fire Department. Essential for construction completion, occupancy, and business operations in high-risk zones.

  • Follow every step from your phone
  • Written quote first
You receiveDone

NOC Issued

Fire License Registration · sample

Every step tracked in your login

  • Written quote before any work
  • Secure online payment
  • One office number

Our fee

In a written quote, before any work

Our fee, government fees and GST shown separately. Nothing is charged until you accept.

Get a written quote

About: Fire License Registration

+91

No charge for the call or the quote. We use these details only to answer your enquiry. See our privacy policy.

Secure online paymentGST invoiceOne office number

Operating without a Fire NOC may invalidate your insurance policy in case of fire damage.

What you get

Everything handed over, nothing left hanging.

  • NOC Issued

    Kept in your login to download any time, with every paper of the work.

  • Every step in view

    Your quote, payment, documents and each stage of the work on one screen.

  • Reminders before dates

    The returns and renewals that follow are added to your dates, with a reminder before each.

  • A person to ask

    Chat with the team doing the work. Calls go to the one office number.

At a glance

What this service covers

  • Occupancy Permit

    It is a prerequisite for obtaining the Completion Certificate and Occupancy Certificate (OC) from the Municipal Corporation.

  • Business License

    Mandatory for getting other commercial licenses, including Trade License and Factory License, in many states.

  • Public Safety

    Ensures the building meets all safety standards for evacuation and fire suppression, protecting lives and assets.

Options

Packages

We guide you through the process for various stages.

  • Provisional NOC

    For Building Sanction

    Construction Stage

    • Scrutiny of Architectural Plans
    • Layout Compliance Check
    • Application Filing
    • Fire Dept. Fee Payment
  • Recommended

    Final Fire NOC

    For Business Operation

    Occupancy Stage

    • On-site Inspection Prep
    • Final System Testing
    • Liaison with Chief Fire Officer
    • Final NOC Issuance
  • NOC Renewal

    Annual / Biannual Renewal

    Compliance

    • System Audit & Report
    • Renewal Filing
    • Fire Safety Logbook Check
    • Dedicated Manager

Amounts are indicative. The fee for your case comes in a written quote, with our professional fee, government fees and GST shown separately. Nothing starts until you accept it.

Documents

Documents we will ask for

Nothing to send now. After you accept the quote and pay, you upload these from your phone against this same list, and each one shows whether it is received, approved or needs to be sent again.

  • Architectural Plans

    (Building Layout & Section)

  • Fire Fighting System Details

    (Pumps, Sprinklers)

  • Completion Certificate

    (Building Structure)

  • Test Reports

    of Fire Safety Equipment

  • Previous Provisional NOC

    Copy

The work, stage by stage

Stages of the work

You see these same stages in your login once the work starts, and you are told when each one is done.

  1. 1

    Compliance Check

    We review your site/plans against National Building Code (NBC) standards.

  2. 2

    Filing

    Application is submitted online to the respective State Fire Department.

  3. 3

    Physical Audit

    The Fire Officer conducts a mandatory site inspection of all systems.

  4. 4

    NOC Issued

    The Final Fire NOC is issued, allowing legal occupancy.

Questions

Frequently asked

Something else on your mind? Call the office - it is always the same number.

Is Fire NOC mandatory for my building?

Yes, if your building is a high-rise (above 15 meters/5 stories), or is used for public assembly (Hospital, School, Mall, Theatre, Factory).

How long is a Fire NOC valid?

Provisional NOC (for construction) is valid for 1-2 years. Final NOC (for operation) is generally valid for 1-3 years and must be renewed regularly based on state rules.

What happens during the physical inspection?

The Fire Officer will check the functionality of your fire suppression systems (sprinklers, hydrants, alarms), the width of exit staircases, and the adequacy of fire extinguishers.

Next step

Ready to start Fire License Registration?

Tell us what you need. A sales expert calls you from the office number and sends a written quote.